MEPFS / Plumbing & sanitary

Water in. Water out.

Coordinate water supply, drainage, waste, and sewage treatment requirements with space, use, maintenance, and the wider project.

MEPFS overview ↑PlumbingSanitary

Provisional discipline page

Resolve routes before space closes.

Kyriarch’s documented plumbing and sanitary scope includes water supply, drainage, waste, and sewage treatment systems. Exact demand criteria, system selection, calculations, drawings, specifications, and support depend on the agreed brief.

This page is a scope guide and does not assert a fixed deliverable package.

01

Water supply

Define the supply requirement, demand criteria, routes, equipment, and connected fixtures included in scope.

Ask about supply ↗
02

Drainage

Coordinate drainage requirements with levels, routes, collection points, access, and project interfaces.

Ask about drainage ↗
03

Waste systems

Clarify the sanitary and waste-system requirements that form part of the project brief.

Ask about waste ↗
04

Sewage treatment

Confirm whether sewage treatment assessment and design interfaces are required for the project.

Ask about treatment ↗